International Journal For Multidisciplinary Research

E-ISSN: 2582-2160     Impact Factor: 9.24

A Widely Indexed Open Access Peer Reviewed Multidisciplinary Bi-monthly Scholarly International Journal

Call for Paper Volume 7, Issue 2 (March-April 2025) Submit your research before last 3 days of April to publish your research paper in the issue of March-April.

Challenges of PV Grid Synchronization: A Case Study of Bangweulu Solar Plant and CEC Solar Plant in Zambia

Author(s) Mr. Francis Kafata, Mr. Ebert Mwala
Country Zambia
Abstract Grid synchronization of photovoltaic (PV) systems is critical for ensuring stable and reliable power delivery, especially in regions with growing renewable energy adoption. This paper examines the challenges faced by the Bangweulu Solar Plant and the Copperbelt Energy Company (CEC) Solar Plant in Zambia, highlighting key synchronization issues that hinder optimal grid integration. Through detailed analysis, the study identifies factors such as grid instability, power quality disturbances, and varying load demands as primary challenges. Advanced monitoring tools and data-driven insights are used to evaluate the impact of these challenges on system performance and compliance with grid codes. Additionally, the paper explores potential mitigation strategies, including advanced control techniques and infrastructure upgrades, tailored to the local context. The findings aim to inform stakeholders and contribute to the broader discourse on enhancing PV grid integration in sub-Saharan Africa.
Keywords PV Grid Synchronization, 2. Bangweulu Solar Plant, 3. CEC Solar Plant, 4. Solar Energy in Zambia, 5. Synchronization Control
Field Engineering
Published In Volume 7, Issue 2, March-April 2025
Published On 2025-04-03
DOI https://doi.org/10.36948/ijfmr.2025.v07i02.40175
Short DOI https://doi.org/g9dgtg

Share this