International Journal For Multidisciplinary Research
E-ISSN: 2582-2160
•
Impact Factor: 9.24
A Widely Indexed Open Access Peer Reviewed Multidisciplinary Bi-monthly Scholarly International Journal
Home
Research Paper
Submit Research Paper
Publication Guidelines
Publication Charges
Upload Documents
Track Status / Pay Fees / Download Publication Certi.
Editors & Reviewers
View All
Join as a Reviewer
Get Membership Certificate
Current Issue
Publication Archive
Conference
Publishing Conf. with IJFMR
Upcoming Conference(s) ↓
SJC-2026
Conferences Published ↓
AIMAR-2025
SVGASCA-2025
ICCE-2025
ICMESS-24
Chinai-2023
PIPRDA-2023
ICMRS'23
ICCAIoT23
Contact Us
Plagiarism is checked by the leading plagiarism checker
Call for Paper
Volume 8 Issue 1
January-February 2026
Indexing Partners
A Study on Delay Analysis and Its Financial Implications in Construction Projects
| Author(s) | Prof. Shrinath Rao Kundapura, Mr. Annadanagouda Channabasanagouda Goudar |
|---|---|
| Country | India |
| Abstract | The construction industry plays a very important role to contribute in national economic development. however, project delays remain a consistent challenge affecting overall project performance and profitability. This research study focuses on delay analysis in construction projects and examines its related financial implications. The study identifies major causes of delays and classifies them into excusable, non-excusable, compensable, and non-compensable categories based on contractual perspectives. A mixed-method research approach is adopted, incorporating an extensive literature review, case study evaluation, and questionnaire surveys conducted among key the construction professionals. The analysis highlights that delay commonly arise due to design modifications, unfavorable site conditions, improper planning, and inefficient resource management, which subsequently lead to financial losses. These losses include increased overrun cost, imposition of liquidated damages, increase in material costs, and loss of possible revenue opportunities for project owners. The project study further examines the role of contractual provisions, Critical Path Method (CPM), scheduling, and forensic delay analysis techniques in resolving delay related claims. The findings indicate that effective risk management practices and the adoption of digital project monitoring tools can significantly minimize delay induced financial impacts, with potential cost reductions ranging between 15% and 20%. This research study aims to identify the main causes of delay analysis and its financial implications in construction project. Due to limited time and availability of information, research is conducted through literature reviews and questionnaire surveys. The findings of this research work will help the contractors and subcontractors in Karnataka state to mitigate or control the irregularities in the future construction works. |
| Keywords | Construction Management, Delay Analysis, Financial Implications, Schedule Overruns, Liquidated Damages, Critical Path Method, Risk Management, Cost Overruns, Forensic Delay Analysis, Contract Administration. |
| Field | Engineering |
| Published In | Volume 8, Issue 1, January-February 2026 |
| Published On | 2026-01-04 |
| DOI | https://doi.org/10.36948/ijfmr.2026.v08i01.65436 |
| Short DOI | https://doi.org/hbhsgn |
Share this

E-ISSN 2582-2160
CrossRef DOI is assigned to each research paper published in our journal.
IJFMR DOI prefix is
10.36948/ijfmr
Downloads
All research papers published on this website are licensed under Creative Commons Attribution-ShareAlike 4.0 International License, and all rights belong to their respective authors/researchers.