Dynamic Baseline Management in Fast-Track Construction Projects

Author(s) Deepika Dayalan
Country United States
Abstract Fast-track construction projects require a very precise schedule, as much as possible, and adaptive management techniques while maintaining quality standards. This research examines the diversification of dynamic baseline management methods in construction project management frameworks and, more specifically, the integration of Primavera P6 enterprise software for its implementation. This study studies how improvement in baseline development, monitoring, and controlled adjustment greatly affects project performance in a compressed schedule. This paper also uses the analysis of industry practices and technical capability to show that dynamic baseline management is a key success factor for fast-track projects, allowing construction managers to achieve project control through the compression of the timeline and overlapping of phases.
Keywords Fast-track construction, Baseline management, Schedule control, Primavera P6, Project acceleration, Construction management.
Field Engineering
Published In Volume 7, Issue 5, September-October 2025
Published On 2025-10-09
DOI https://doi.org/10.36948/ijfmr.2025.v07i05.67509