International Journal For Multidisciplinary Research

E-ISSN: 2582-2160   •   Impact Factor: 9.24

A Widely Indexed Open Access Peer Reviewed Multidisciplinary Bi-monthly Scholarly International Journal

Call for Paper Volume 8, Issue 5 (September-October 2026) Submit your research before last 3 days of October to publish your research paper in the issue of September-October.

Estimation of fabrication cost for Different size of biogas plants in Chhattisgarh, India

Author(s) Shailendra Kumar
Country India
Abstract Total eighteen districts of CG were taken namely Raipur, Mahasamund, Dhamtri, Durg, Rajnandgaon, Kawrda, Bastar, Nararayanpur, Kanker, Daniewada, Bijapur, Bilaspur, janjgir-champa, Koraba, Surguja,. Koriya, Raigarh and Jashpur dueing the years 2006-07 and 2007-08 to collect the data on capacity of biogas, Plants running hours, requirements of constructional material, labor etc. The fabrication cost of 2 m3, 3 m3 and 4 m3 was found Rs14011, Rs16446 and Rs22000, respectively. Total repair and maintenance charge per year for Deen Bandu model of size 2cum is Rs. 315.Total repair and maintenance charge per year for Drum type KVIC model of size 2cum is Rs. 615.Total repair and maintenance charge per year for Deen Bandu model of size 3cum is Rs. 345.Total repair and maintenance charge per year for Drum type KVIC model of size 3cum is Rs. 645.Total repair and maintenance charge per year for Deen Bandu model of size 4cum is Rs. 375.Total repair and maintenance charge per year for Drum type KVIC model of size 4cum is Rs. 675.
Keywords Biogas, Deen Bandu model, KVIC, Operating cost, Repair & maintenance Charges, Size of biogas plants
Published In Volume 8, Issue 1, January-February 2026
Published On 2026-02-04
DOI https://doi.org/10.36948/ijfmr.2026.v08i01.87992

Share this