International Journal For Multidisciplinary Research
E-ISSN: 2582-2160
•
Impact Factor: 9.24
A Widely Indexed Open Access Peer Reviewed Multidisciplinary Bi-monthly Scholarly International Journal
Home
Research Paper
Submit Research Paper
Publication Guidelines
Publication Charges
Upload Documents
Track Status / Pay Fees / Download Publication Certi.
Editors & Reviewers
View All
Join as a Reviewer
Get Membership Certificate
Current Issue
Publication Archive
Conference
Publishing Conf. with IJFMR
Upcoming Conference(s) ↓
Conferences Published ↓
ISC-AISGF-TBRF
DePaul-2026
IC-AIRCM-T3-2026
NSSFIGTMA-2025
SPHERE-2025
AIMAR-2025
SVGASCA-2025
ICRTET-4
ICCE-2025
Chinai-2023
PIPRDA-2023
ICMRS'23
Contact Us
Plagiarism is checked by the leading plagiarism checker
Call for Paper
Volume 8 Issue 6
November-December 2026
Indexing Partners
A Digital Twin Framework for Real-Time Schedule Monitoring and Re-Optimization in Saudi Construction Mega-Projects
| Author(s) | Mr. Ahmed Babu Shahas V P |
|---|---|
| Country | India |
| Abstract | Construction schedules on large projects are usually updated from periodic progress reports, so deviations are recognised days or weeks after they begin. This paper proposes a digital twin framework that closes the loop between the site and the schedule for Saudi mega-projects delivered under Vision 2030. The framework has five layers, covering the physical site, data acquisition, an integrated 4D twin model, analytics and optimization, and decision services. It operates as a six-step cycle of sensing, synchronization, deviation detection, forecasting, re-optimization and instruction, with defined indicators and trigger thresholds. Re-optimization is carried out by testing candidate recovery plans in the twin before one is issued. To illustrate the mechanism, a synthetic project of 48 activities was simulated over 500 runs under four control policies. In this illustrative experiment, mean completion delay fell from 34.4 working days under fortnightly reporting to 11.1 days under daily twin monitoring and to 4.3 days when re-optimization was added. These figures are simulation outputs under stated assumptions and are not field evidence. The paper also sets out an implementation roadmap, the main barriers reported for the Kingdom, and the alignment of the framework with Vision 2030. |
| Keywords | 4D BIM, Digital Twin, Schedule Re-Optimization, Saudi Arabia, Vision 2030 |
| Field | Engineering |
| Published In | Volume 8, Issue 6, November-December 2026 |
| Published On | 2026-11-14 |
| DOI | https://doi.org/10.36948/ijfmr.2026.v08i06.91980 |
Share this

E-ISSN 2582-2160
CrossRef DOI prefix of IJFMR is 10.36948/ijfmr
All research papers published on this website are licensed under Creative Commons Attribution-ShareAlike 4.0 International License, and all rights belong to their respective authors/researchers.
Powered by Sky Research Publication and Journals